科技报告详细信息
Five-Year Review of CERCLA Response Actions at the Idaho National Laboratory
Jolley, W. L.
Idaho National Laboratory - Idaho Closure Project
关键词: Removal;    Monitoring;    Documentation;    Cercla;    Remedial Action;   
DOI  :  10.2172/908802
RP-ID  :  DOE/NE-ID-11201
RP-ID  :  DE-AC0705ID14516
RP-ID  :  908802
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This report summarizes the documentation submitted in support of the five-year review or remedial actions implemented under the Comprehensive Environmental Response, Compensation, and Liability Act Sitewide at the Idaho National Laboratory. The report also summarizes documentation and inspections conducted at the no-further-action sites. This review covered actions conducted at 9 of the 10 waste area groups at the Idaho National Laboratory, i.e. Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 9, and 10. Waste Area Group 8 was not subject to this review, because it does not fall under the jurisdiction of the U.S. Department of Energy Idaho Operations Office. The review included past site inspections and monitoring data collected in support of the remedial actions. The remedial actions have been completed at Waste Area Groups 2, 4, 5, 6, and 9. Remedial action reports have been completed for Waste Area Groups 2 and 4, and remedial action reports are expected to be completed during 2005 for Waste Area Groups 1, 5, and 9. Remediation is ongoing at Waste Area Groups 3, 7, and 10. Remedial investigations are yet to be completed for Operable Units 3-14, 7-13/14, and 10-08. The review showed that the remedies have been constructed in accordance with the requirements of the Records of Decision and are functioning as designed. Immediate threats have been addressed, and the remedies continue to be protective. Potential short-term threats are being addressed though institutional controls. Soil cover and cap remedies are being maintained properly and inspected in accordance with the appropriate requirements. Soil removal actions and equipment or system removals have successfully achieved remedial action objectives identified in the Records of Decision. The next Sitewide five-year review is scheduled for completion by 2011.

【 预 览 】
附件列表
Files Size Format View
908802.pdf 34073KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:20次