Post-Closure Inspection Report for Corrective Action Unit 92: Area 6 Decon Pond Facility, Nevada Test Site, Nevada, for Calendar Year 2006
National Security Technologies, LLC
National Security Technologies, LLC
关键词: Ponds;    Decontamination;    Nevada Test Site;    Calendars;    Environmental Protection;   
DOI  :  10.2172/901889
RP-ID  :  DOE/NV--1191
RP-ID  :  DE-AC52-06NA25946
RP-ID  :  901889
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】
This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility. CAU 92 was closed according to the ''Resource Conservation and Recovery Act'' (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection [NDEP], 1995) and the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs), CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in.]) in a 24-hour period. This report covers calendar year 2006. Quarterly site inspections were performed in March, June, September, and December of 2006. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A of this report, and photographs taken during the site inspections are included in Appendix B of this report. One additional inspection was performed after a precipitation event that exceeded 1.28 cm (0.50 in.) within a 24-hour period during 2006. No significant changes in site conditions were noted during this inspection, and no corrective actions were necessary. A copy of the inspection checklist and field notes completed during this additional inspection is included in Appendix A of this report. Precipitation records for 2006 are included in Appendix C of this report.
【 预 览 】
附件列表
Files Size Format View
901889.pdf 6026KB PDF download
  文献评价指标  
  下载次数:19次 浏览次数:8次