Experimental Plan: Uranium Stabilization Through Polyphosphate Injection 300 Area Uranium Plume Treatability Demonstration Project | |
Wellman, Dawn M. ; Fruchter, Jonathan S. ; Vermeul, Vince R. | |
Pacific Northwest National Laboratory (U.S.) | |
关键词: Uranium; Phosphates; Stabilization; Ground Water; Fluid Injection; | |
DOI : 10.2172/900214 RP-ID : PNNL-16101 RP-ID : AC05-76RL01830 RP-ID : 900214 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This Test Plan describes a laboratory-testing program to be performed at Pacific Northwest National Laboratory (PNNL) in support of the 300-FF-5 Feasibility Study (FS). The objective of the proposed treatability test is to evaluate the efficacy of using polyphosphate injections to treat uranium contaminated groundwater in situ. This study will be used to: (1) Develop implementation cost estimates; (2) Identify implementation challenges; and (3) Investigate the technology's ability to meet remedial objectives These activities will be conducted in parallel with a limited field investigation, which is currently underway to more accurately define the vertical extent of uranium in the vadose zone, and in the capillary fringe zone laterally throughout the plume. The treatability test will establish the viability of the method and, along with characterization data from the limited field investigation, will provide the means for determining how best to implement the technology in the field. By conducting the treatability work in parallel with the ongoing Limited Field Investigation, the resulting Feasibility Study (FS) will provide proven, site-specific information for evaluating polyphosphate addition and selecting a suitable remediation strategy for the uranium plume within the FS time frame at an overall cost savings.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
900214.pdf | 735KB | download |