Nevada Transportatoion Options Study
GEHNER, P. ; WEAVER, E.M. ; FOSSUM, L.
United States. Department of Energy. Yucca Mountain Project Office.
关键词: Environmental Impacts;    Trucks;    Propulsion;    Road Transport;    Casks;   
DOI  :  10.2172/899335
RP-ID  :  TDR-OSS-SE-000001, Rev. 00
RP-ID  :  NA
RP-ID  :  899335
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This study performs a cost and schedule analysis of three Nevada Transportation options that support waste receipt at the repository. Based on the U.S. Department of Energy preference for rail transportation in Nevada (given in the Final Environmental Impact Statement), it has been assumed that a branch rail line would be constructed to support waste receipt at the repository. However, due to potential funding constraints, it is uncertain when rail will be available. The three Nevada Transportation options have been developed to meet a varying degree of requirements for transportation and to provide cost variations used in meeting the funding constraints given in the Technical Direction Letter guidelines for this study. The options include combinations of legal-weight truck, heavy-haul truck, and rail. Option 1 uses a branch rail line that would support initial waste receipt at the repository in 2010. Rail transportation would be the primary mode, supplemented by legal weight trucks. This option provides the highest level of confidence in cost and schedule, lowest public visibility, greatest public acceptability, lowest public dose, and is the recommended option for support of waste receipt. The completion of rail by 2010 will require spending approximately $800 million prior to 2010. Option 2 uses a phased rail approach to address a constrained funding scenario. To meet funding constraints, Option 2 uses a phased approach to delay high cost activities (final design and construction) until after initial waste receipt in 2010. By doing this, approximately 95 percent of the cost associated with completion of a branch rail line is deferred until after 2010. To support waste receipt until a branch rail line is constructed in Nevada, additional legal-weight truck shipments and heavy-haul truck shipments (on a limited basis for naval spent nuclear fuel) would be used to meet the same initial waste receipt rates as in Option 1. Use of heavy-haul shipments in the absence of rail is restricted to approximately twelve, without upgrading public highways. There is high uncertainty as to what road upgrades and security/escorts the Nevada Department of Transportation would require to obtain an overweight/overdimensional permit. In addition, the Naval Nuclear Propulsion Program has indicated that a larger cask weight than that analyzed in the Final Environmental Impact Statement may be required for naval shipments, resulting in additional costs for heavy-haul transport. These uncertainties result in a high cost and schedule risk. Option 3 assumes that the start of rail construction will be delayed until after construction authorization is received from the Nuclear Regulatory Commission. Similar to Option 2, Option 3 uses legal-weight truck shipments and limited heavy haul truck shipments to meet the same initial waste receipt rates as Option 1, until rail becomes available. By using heavy-haul truck for two years, Option 3 contains the same uncertainties and resultant high cost and schedule risk as Option 2. The cost and schedule of legal-weight truck transport are not included in this report as that will be evaluated in the report on national transportation.

【 预 览 】
附件列表
Files Size Format View
899335.pdf 1519KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:18次