In-Situ Sampling and Characterization of Naturally Occurring Marine Methane Hydrate Using the D/V JOIDES Resolution
Rack, Frank
Joint Oceanograph Institutions
关键词: Pistons;    Availability;    Gas Hydrates;    Sampling;    Resolution;   
DOI  :  10.2172/896479
RP-ID  :  None
RP-ID  :  FC26-01NT41329
RP-ID  :  896479
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The primary accomplishments during the first quarter were to mobilize materials and supplies to meet the deployment schedule for equipment and activities, as proposed under the DOE/NETL cooperative agreement with JOI, with initial testing and use of specialized tools and equipment on Ocean Drilling Program (ODP) Leg 201. As a requirement of the award, two copies of a technical feasibility report entitled ''Preliminary Evaluation of Existing Pressure/Temperature Coring Systems'' were delivered to DOE/NETL on October 22, 2001. The report was written to provide a discussion of the availability and compatibility of the four existing pressure coring devices in existence. Most of these systems are available for use by JOI/ODP aboard the D/V JOIDES Resolution, via purchase, lease, modification, etc. and the proposed capabilities to upgrade existing devices or systems for use on other platforms. In addition, the report provided a discussion of the compatibility of each existing coring device in conjunction with the use of the other coring devices, such as the advanced piston coring (APC) system used by ODP. Based on an evaluation of the JOI report, the DOE/NETL Program Manager William Gwilliam provided a ''Go'' decision to JOI for the further development of the ODP Pressure Coring System (PCS) and PCS Gas Manifold. During the reporting period negotiations were conducted with various potential subcontractors and vendors to establish the specific cost-sharing arrangements and work breakdown necessary to definitize the terms of the DOE/NETL cooperative agreement with JOI. The discussions were communicated with the DOE/NETL Program Manager, William Gwilliam, to keep NETL closely informed about events as this project evolved. A series of meetings were also held with ODP engineers, technical staff, and to plan for the implementation of the various tasks outlined in the JOI proposal to DOE for deployment during ODP Legs 201 and 204. These meetings helped to answer numerous unresolved questions and establish a firm timetable of remaining activities that needed to be accomplished by January 28, 2002, when ODP Leg 201 will begin.

【 预 览 】
附件列表
Files Size Format View
896479.pdf 121KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:24次