科技报告详细信息
Utility Advanced Turbine Systems Program (ATS) Technical Readiness Testing and Pre-Commercial Demonstration
Westinghouse, Siemens
Westinghouse Electric Corporation
关键词: Natural Gas;    Gas Turbines;    Biomass;    Heat Rate;    Turbines;   
DOI  :  10.2172/896302
RP-ID  :  None
RP-ID  :  FC21-95MC32267
RP-ID  :  896302
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The objective of the ATS program is to develop ultra-high efficiency, environmentally superior and cost competitive gas turbine systems for base load application in utility, independent power producer and industrial markets. Specific performance targets have been set using natural gas as the primary fuel: (1) System efficiency that will exceed 60% (lower heating value basis) on natural gas for large scale utility turbine systems; for industrial applications, systems that will result in a 15% improvement in heat rate compared to currently available gas turbine systems. (2) An environmentally superior system that will not require the use of post combustion emissions controls under full load operating conditions. (3) Busbar energy costs that are 10% less than current state-of-the-art turbine systems, while meeting the same environmental requirements. (4) Fuel-flexible designs that will operate on natural gas but are capable of being adapted to operate on coal-derived or biomass fuels. (5) Reliability-Availability-Maintainability (RAM) that is equivalent to the current turbine systems. (6) Water consumption minimized to levels consistent with cost and efficiency goals. (7) Commercial systems that will enter the market in the year 2000. In Phase I of the ATS program, Siemens Westinghouse found that efficiency significantly increases when the traditional combined-cycle power plant is reconfigured with closed-loop steam cooling of the hot gas path. Phase II activities involved the development of a 318MW natural gas fired turbine conceptual design with the flexibility to burn coal-derived and biomass fuels. Phases I and II of the ATS program have been completed. Phase III, the current phase, completes the research and development activities and develops hardware specifications from the Phase II conceptual design. This report summarizes Phase III Extension activities for a three month period. Additional details may be found in monthly technical progress reports covering the period stated on the cover of this report. Background information regarding the work to be completed in Phase III may be found in the revised proposal submitted in response to A Request for Extension of DE-FC21-95MC32267, dated May 29, 1998 and the Continuing Applications of DE-FC21-95MC32267, dated March 31, 1999 and November 19, 1999.

【 预 览 】
附件列表
Files Size Format View
896302.pdf 142KB PDF download
  文献评价指标  
  下载次数:4次 浏览次数:18次