科技报告详细信息
DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM
Cobern, Martin E.
Aps Technology
关键词: Oil Wells;    02 Petroleum;    Monitoring;    Progress Report;    Mathematical Models;   
DOI  :  10.2172/894899
RP-ID  :  None
RP-ID  :  FC26-02NT41664
RP-ID  :  894899
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II were: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. Phase II concluded on January 31, 2006, and the final report was issued. Work on Phase III of the project began during the previous quarter. Efforts this quarter have focused on the manufacture of the prototype and precommercial parts, field test planning and commercialization. The current extreme lead times quoted by oilfield machine shops for collar components, will delay the deployment of the field prototypes. The delivery date for five critical parts from one supplier has slipped to late November, which will preclude deployment for a field test before late December or early January. We are exploring whether we can take the partially made parts and complete them earlier in our own shop.

【 预 览 】
附件列表
Files Size Format View
894899.pdf 43KB PDF download
  文献评价指标  
  下载次数:18次 浏览次数:8次