PNNL 331 Building Arc Flash Team Investigation Report | |
Deichman, Mark L. ; Drewrey, John C. ; Hodges, Hurtis ; Madson, Vernon J. ; Minton, Allen L. ; Montgomery, Daniel M. ; Olson, Marvin E. ; Rojas, Pedro H. ; Sanan, Sanjay K. ; Sharp, Reed D. ; Sparks, Bobby R. ; Swearingen, Gary L. | |
Pacific Northwest National Laboratory (U.S.) | |
关键词: Repair; Fluke Meters; Electric Arcs; Ppe; Flash Burns; | |
DOI : 10.2172/890727 RP-ID : PNNL-15865 RP-ID : AC05-76RL01830 RP-ID : 890727 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
On Friday, April 21, 2006, a PNNL electrician was performing repair of an electrical system for the 331 Building chilled water pump (CHWP) No.2, when an electrical arc flash occurred inside a 480V combination motor starter. The electrician was taken to the on-site medical provider for evaluation and was released for return to work without restriction. The electrician was not shocked, but did receive a minor, superficial (first degree) burn on the left wrist. This report, the result of a thorough review by the 331 Building Arc Flash Assessment Team, provides an in-depth look at the steps leading up to the arc-flash and recommendations and opportunities for improvement.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
890727.pdf | 967KB | download |