科技报告详细信息
A New Process for Hot Metal Production at Low Fuel Rate - Phase 1 Feasibility Study
Lu, Dr. Wei-Kao
McMaster University, Department of Materials Science and Engineering
关键词: Capacity;    Metal Industry;    Steels Steel, Hot Metal, Furnaces;    Furnaces;    32 Energy Conservation, Consumption, And Utilization;   
DOI  :  10.2172/886736
RP-ID  :  None
RP-ID  :  FC36-97ID13554
RP-ID  :  886736
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The project is part of the continuing effort by the North American steel industry to develop a coal-based, cokeless process for hot metal production. The objective of Phase 1 is to determine the feasibility of designing and constructing a pilot scale facility with the capacity of 42,000 mtpy of direct reduced iron (DRI) with 95% metallization. The primary effort is performed by Bricmont, Inc., an international engineering firm, under the supervision of McMaster University. The study focused on the Paired Straight Hearth furnace concept developed previously by McMaster University, The American Iron and Steel Institute and the US Department of Energy.

【 预 览 】
附件列表
Files Size Format View
886736.pdf 2466KB PDF download
  文献评价指标  
  下载次数:29次 浏览次数:43次