A New Process for Hot Metal Production at Low Fuel Rate - Phase 1 Feasibility Study | |
Lu, Dr. Wei-Kao | |
McMaster University, Department of Materials Science and Engineering | |
关键词: Capacity; Metal Industry; Steels Steel, Hot Metal, Furnaces; Furnaces; 32 Energy Conservation, Consumption, And Utilization; | |
DOI : 10.2172/886736 RP-ID : None RP-ID : FC36-97ID13554 RP-ID : 886736 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The project is part of the continuing effort by the North American steel industry to develop a coal-based, cokeless process for hot metal production. The objective of Phase 1 is to determine the feasibility of designing and constructing a pilot scale facility with the capacity of 42,000 mtpy of direct reduced iron (DRI) with 95% metallization. The primary effort is performed by Bricmont, Inc., an international engineering firm, under the supervision of McMaster University. The study focused on the Paired Straight Hearth furnace concept developed previously by McMaster University, The American Iron and Steel Institute and the US Department of Energy.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
886736.pdf | 2466KB | download |