U.S. Nuclear Power Plant Operating Cost and Experience Summaries | |
Reid, RL | |
Oak Ridge National Laboratory | |
关键词: Expenditures; Enforcement; Maintenance; Production; Fluctuations; | |
DOI : 10.2172/885876 RP-ID : ORNL/TM-2003/219 RP-ID : DE-AC05-00OR22725 RP-ID : 885876 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
885876.pdf | 595KB | download |