Dissolution of FB-Line Cabinet Sweepings | |
Crowder, Mark L. | |
Savannah River Site (S.C.) | |
关键词: Fluorides; 08 Hydrogen; Personnel; Stabilization; Dissolution; | |
DOI : 10.2172/881517 RP-ID : WSRC-TR-2004-00635 RP-ID : DE-AC09-96SR18500 RP-ID : 881517 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
Three FB-Line samples were received by the Savannah River National Laboratory (SRNL) for characterization and evaluation for suitability for HB-Line dissolution. These samples are part of a larger sampling/evaluation program in support of FB-Line deinventory efforts. The samples studied were identified as MC04-147- HBL, MC04-148-HBL, and FBL-SWP-04-016-HBL (N). The first sample, MC04-147-HBL, is a portion of FB-Line Packaging and Stabilization (P&S) materials. The second sample, MC04-148-HBL, is a sweeping from Cabinet 6-8, which is not representative of the mechanical line. The third sample, FBL-SWP-04-016-HBL (N), is an FB-Line North cabinet sweeping. The samples were described by FB-Line personnel as containing plutonium oxide (PuO{sub 2}) which had not been high-fired. This description was generally confirmed by solids analysis and off gas measurements. All three samples were dissolved in 8 M HNO{sub 3}/0.1 M KF at 90-100 C leaving minor amounts of solid residue. During dissolution, sample MC04-147 did not generate hydrogen gas. Sample MC04-148 generated modest amounts of gas, which contained 4.0 to 4.7 volume percent (vol %) hydrogen (H{sub 2}) at a ratio of up to 8.4 x 10{sup -5} mol H{sub 2}/g sample. Sample FBL-SWP-04-016-HBL (N) was nearly completely soluble in 8 M HNO{sub 3}and produced a very small amount of gas. Apparently, the CaF{sub 2} in that sample dissolves and provides sufficient fluoride to support the dissolution of other components.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
881517.pdf | 1054KB | download |