Program Plan for Revision of the Z-Area Saltstone Disposal Facility Performance Assessment
Cook, James R.
Office of Scientific and Technical Information, Oak Ridge, TN
关键词: Radioactive Waste Disposal;    Radioactive Waste Facilities;    Program Management;    Planning;    12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities;   
DOI  :  10.2172/881505
RP-ID  :  WSRC-RP-2005-01913
RP-ID  :  DE-AC09-96SR18500
RP-ID  :  881505
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Savannah River National Laboratory (SRNL) and the Saltstone Project, are embarking on the next revision to the Saltstone Disposal Facility (SDF) performance assessment (PA). This program plan has been prepared to outline the general approach, scope, schedule and resources for the PA revision. The plan briefly describes the task elements of the PA process. It discusses critical PA considerations in the development of conceptual models and interpretation of results. Applicable quality assurance (QA) requirements are identified and the methods for implementing QA for both software and documentation are described. The plan identifies project resources supporting the core team and providing project oversight. Program issues and risks are identified as well as mitigation of those risks. Finally, a preliminary program schedule has been developed and key deliverables identified. A number of significant changes have been implemented since the last PA revision resulting in a new design for future SDF disposal units. This revision will encompass the existing and planned disposal units, PA critical radionuclides and exposure pathways important to SDF performance. An integrated analysis of the overall facility layout, including all disposal units, will be performed to assess the impact of plume overlap on PA results. Finally, a rigorous treatment of uncertainty will be undertaken using probabilistic simulations. This analysis will be reviewed and approved by DOE-SR, DOE-HQ and potentially the Nuclear Regulatory Commission (NRC). This revision will be completed and ready for the start of the DOE review at the end of December 2006. This work supports a Saltstone Vault 2 fee-bearing milestone. This milestone includes completion of the Vault 2 module of the PA revision by the end of FY06.

【 预 览 】
附件列表
Files Size Format View
881505.pdf 537KB PDF download
  文献评价指标  
  下载次数:4次 浏览次数:17次