科技报告详细信息
Particle Tracking Model and Abstraction of Transport Processes
Robinson, B.
United States. Department of Energy. Yucca Mountain Project Office.
关键词: Management;    Testing;    12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities;    License Applications;    Transcription;   
DOI  :  10.2172/839526
RP-ID  :  MDL-NBS-HS-000020, REV 01
RP-ID  :  AC28-01RW12101
RP-ID  :  839526
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The purpose of this report is to document the abstraction model being used in total system performance assessment (TSPA) model calculations for radionuclide transport in the unsaturated zone (UZ). The UZ transport abstraction model uses the particle-tracking method that is incorporated into the finite element heat and mass model (FEHM) computer code (Zyvoloski et al. 1997 [DIRS 100615]) to simulate radionuclide transport in the UZ. This report outlines the assumptions, design, and testing of a model for calculating radionuclide transport in the UZ at Yucca Mountain. In addition, methods for determining and inputting transport parameters are outlined for use in the TSPA for license application (LA) analyses. Process-level transport model calculations are documented in another report for the UZ (BSC 2004 [DIRS 164500]). Three-dimensional, dual-permeability flow fields generated to characterize UZ flow (documented by BSC 2004 [DIRS 169861]; DTN: LB03023DSSCP9I.001 [DIRS 163044]) are converted to make them compatible with the FEHM code for use in this abstraction model. This report establishes the numerical method and demonstrates the use of the model that is intended to represent UZ transport in the TSPA-LA. Capability of the UZ barrier for retarding the transport is demonstrated in this report, and by the underlying process model (BSC 2004 [DIRS 164500]). The technical scope, content, and management of this report are described in the planning document ''Technical Work Plan for: Unsaturated Zone Transport Model Report Integration'' (BSC 2004 [DIRS 171282]). Deviations from the technical work plan (TWP) are noted within the text of this report, as appropriate. The latest version of this document is being prepared principally to correct parameter values found to be in error due to transcription errors, changes in source data that were not captured in the report, calculation errors, and errors in interpretation of source data.

【 预 览 】
附件列表
Files Size Format View
839526.pdf 1867KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:24次