科技报告详细信息
DEVELOPMENT OF BYPASSED OIL RESERVES USING BEHIND CASING RESISTIVITY MEASUREMENTS
Conner, Michael G. ; Blesener, Jeffrey A.
Terra Exploration and Production Company (United States)
关键词: Cements;    Productivity;    Oil Saturation;    Production;    Sand;   
DOI  :  10.2172/837832
RP-ID  :  NONE
RP-ID  :  FG26-03NT15435
RP-ID  :  837832
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Tubing and rods of the S.P. Pedro-Nepple No.1 well were pulled and the well was prepared for running of Schlumberger's Cased Hole Formation Resistivity Tool (CHFR) in selected intervals. The CHFR tool was successfully run and data was captured. The CHFR formation resistivity readings were compared to original open hole resistivity measurements. Separation between the original and CHFR resistivity curves indicate both swept and un-swept sand intervals. Both watered out sand intervals and those with higher remaining oil saturation have been identified. Due to the nature of these turbidite sands being stratigraphically continuous, both the swept and unswept layers have been correlated across to one of the four nearby offset shallow wells. As a result of the cased hole logging, one well was selected for a workover to recomplete high oil saturated shallow sand intervals. During the second report period, well S.P. Pedro-Nepple No.2 was plugged back with cement excluding the previously existing production interval, squeeze cemented behind casing, selectively perforated in the shallower ''Bell'' zone and placed on production to develop potential new oil reserves and increase overall well productivity. Prior workover production averaged 3.0 BOPD for the previous six-months. Post workover well production was marginally increased to 3.7 BOPD on average for the following six months.

【 预 览 】
附件列表
Files Size Format View
837832.pdf 499KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:29次