| Drip shield Structural Response to Rock Fall | |
| Ceylan, Z. | |
| United States. Department of Energy. Yucca Mountain Project Office. | |
| 关键词: Management; Dimensions; License Applications; 01 Coal, Lignite, And Peat; 36 Materials Science; | |
| DOI : 10.2172/837498 RP-ID : 000-00C-SSE0-00300-000-00A RP-ID : NONE RP-ID : 837498 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
The objective of this calculation is to determine areas over the drip shield (DS) top plate and side-walls where the residual stress values exceed 50% of Ti-7 yield strength. These areas will also be referred to as the damaged areas throughout this document. The scope of this document is limited to reporting the calculation results in terms of the damaged areas based on a chosen set of stress components. This calculation is intended for use in support of the preliminary design activities for the license application design of the DS. This calculation is associated with the DS design and was performed by the Waste Package and Components. AP-3.12Q, ''Design Calculations and Analyses'' is used to perform the calculation and develop the document. The DS is classified as a safety category item. Therefore, this calculation is subject to the Quality Assurance Requirements and Description. The information provided by the sketches attached to this calculation is that of the potential design of the type of DS considered in this calculation and provides the potential dimensions and materials for the DS design. The finite element (FE) calculation was performed by using the commercially available LS-DYNA Version (V)960 (Software Tracking Number [STN] 10300-960.1106-00, Ref. 7) FE code. The results of this calculation were evaluated using residual first principal stress. Subsequent analysis of areas determined by residual stresses have been reported in the results section of this document. The finite element mesh adequacy was determined based on the maximum stress intensity and maximum first principal stress. The current work processes and procedures for the control of the electronic management of data for this activity were conducted in accordance with AP-3.13Q, ''Design Control'' (Section 5.1.2).
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 837498.pdf | 3251KB |
PDF