Ultra-Sensitive Elemental and Isotope Measurements with Compact Plasma Source Cavity Ring-Down Spectroscopy (CPS-CRDS) | |
Wang, Chuji | |
Mississippi State University, Mississippi State, MS (United States) | |
关键词: Management; Flow Rate; Decontamination; Operating Cost; 37 Inorganic, Organic, Physical And Analytical Chemistry; | |
DOI : 10.2172/835415 RP-ID : EMSP-86680-2003A RP-ID : FG07-02ER63515 RP-ID : 835415 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The proposed research is to develop a new class of instruments for actinide isotopes and hazardous element analysis through coupling highly sensitive cavity ring-down spectroscopy to a compact microwave plasma source. The research work will combine advantages of CRDS measurement with a low power, low flow rate, tubing-type microwave plasma source to reach breakthrough sensitivity for elemental analysis and unique capability of isotope measurement. The project has several primary goals: (1) Explore the feasibility of marrying CRDS with a new microwave plasma source; (2) Provide quantitative evaluation of CMP-CRDS for ultra-trace elemental and actinide isotope analysis; (3) Approach a breakthrough detection limit of ca. 10-13 g/ml or so, which are orders of magnitude better than currently available best values; (4) Demonstrate the capability of CMP-CRDS technology for isobaric measurements, such as 238U and 238Pu isotopes. (5) Design and assemble the first compact, field portable CMP-CRDS instrument with a high-resolution diode laser for DOE/EM on-site demonstration. With all these unique capabilities and sensitivities, we expect CMP-CRDS will bring a revolutionary change in instrument design and development, and will have great impact and play critical roles in supporting DOE's missions in environmental remediation, environmental emission control, waste management and characterization, and decontamination and decommissioning. The ultimate goals of the proposed project are to contribute to environmental management activities that would decrease risk for the public and workers, increase worker productivity with on-site analysis, and tremendously reduce DOE/EM operating costs.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
835415.pdf | 27KB | download |