INDUSTRIAL ADVANCED TURBINE SYSTEMS: DEVELOPMENT & DEMONSTRATION
Escola, George
Solar Turbines Inc. (United States)
关键词: Commercialization;    Turbines;    32 Energy Conservation, Consumption, And Utilization;    Maintenance;    Stability;   
DOI  :  10.2172/826139
RP-ID  :  NONE
RP-ID  :  FC21-95MC31173
RP-ID  :  826139
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Rochelle Municipal Utilities (RMU) was selected for the field evaluation site and placed an order for the first Mercury 50 generator set in November 1997. Field evaluation of the Mercury 50 package at Rochelle began in June 2000 and ran through December 2003. A total of 4,749 package hours were achieved on two generation 2-design engines. Engine Serial Number (ESN) 6 was installed in April 2000 and accumulated 2,324 hours and 267 starts until it was exchanged for ESN 7 in April 2001. ESN 7 ran until completion of the field evaluation period accumulating 2,426 hours and 292 starts. While the 4,749 hours of package operation falls short of the 8,000-hour goal, important lessons were learned at the Rochelle site that resulted in bringing a far superior generation 3 Mercury 50 package to commercialization. Among the issues raised and resolved were: (1) Engine shaft stability; (2) Engine power and efficiency degradation--Air inlet Restrictions, Compressor Efficiency, Turbine Efficiency, Exhaust System Cracks/Leaks; (3) Recuperator Core Durability; (4) Cold Weather Operations; (5) Valve Actuator Reliability; and (6) Remote Operation and Maintenance Support.

【 预 览 】
附件列表
Files Size Format View
826139.pdf 175KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:4次