科技报告详细信息
DWPF Glass Air-Lift Pump Life Cycle Testing and Plant Implementation
SMITH, MICHAEL
Savannah River Site (S.C.)
关键词: Testing;    Waste Forms;    Life Cycle Assessment;    Radioactive Waste Processing;    Melting;   
DOI  :  10.2172/824423
RP-ID  :  WSRC-MS-2004-00202
RP-ID  :  AC09-96SR18500
RP-ID  :  824423
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Due to the accelerated cleanup at the Savannah River Site (SRS), efforts are underway to increase the glass melt rate and hence the high level waste processing throughput at the SRS Defense Waste Processing Plant Facility (DWPF). One of the proposed process/equipment improvements is a glass air-lift pump. The use of a glass air-lift pump to increase melt rate in the DWPF Melter has been investigated via several techniques including lab scale testing on various melters. The final test before implementation in DWPF was a long-term life cycle test (several months in duration) on a full size pump. The air-lift pump was successfully tested and no major problems were found. Based on this test a unit was designed and fabricated for DWPF and was installed in the DWPF Melter in February 2004.

【 预 览 】
附件列表
Files Size Format View
824423.pdf 582KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:21次