科技报告详细信息
DIII-D YPGRADE PROJECT FINAL REPORT FOR THE PERIOD OCTOBER 1, 1993 THROUGH MAY 31, 2003
STAMBAUGH, RD
General Atomic Company
关键词: Experimental Reactors;    Heating;    43 Particle Accelerators;    Cyclotrons;    Doublet-3 Device;   
DOI  :  10.2172/824157
RP-ID  :  NONE
RP-ID  :  AC03-99ER54463
RP-ID  :  824157
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

OAK-B135 Under DOE Contracts DE-AC03-89ER51114 and DE-AC03-99ER54463 to General Atomics (GA), three ''capital project'' upgrade projects were accomplished on DIII-D from FY93 to FY03 at a total GA cost of $27.2M. These projects included the Fast Wave Current Drive (FWCD) Upgrade ($8.2M), the Radiative Divertor Upgrade ($7.2M) and the Electron Cyclotron Heating (ECH) Upgrade ($11.8M). The ECH and FWCD upgrades provided DIII-D rf and microwave power for electron heating, driving plasma current, controlling the plasma current profile, controlling tearing mode instabilities, and modulated transport studies.The divertor provided adequate density and impurity control for high triangularity single null plasmas in the Advanced Tokamak (AT) Program and information for International Thermonuclear Experimental Reactor (ITER) divertor design. These upgrades provide the power and density control required to initiate the active control of advanced tokamak discharges, which is the key element in the DIII-D program.

【 预 览 】
附件列表
Files Size Format View
824157.pdf 15218KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:14次