Ceramic Membrane Enabling Technology for Improved IGCC Efficiency, Quarterly Technical Progress Report: October 1 - December 31, 2002
Prasad, Ravi
Praxair, Inc.
关键词: Coal Gasification;    Membranes;    Oxygen Plants;    01 Coal, Lignite, And Peat;    20 Fossil-Fueled Power Plants;   
DOI  :  10.2172/823620
RP-ID  :  NONE
RP-ID  :  FC26-99FT40437
RP-ID  :  823620
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The objectives of the first year of phase 2 of the program are to construct and operate an engineering pilot reactor for OTM oxygen. Work to support this objective is being undertaken in the following areas in this quarter: Element reliability; Element fabrication; Systems technology; Power recovery; and IGCC process analysis and economics. The major accomplishments this quarter were: (1) Methods to improve the strength and stability of PSO1x were identified. (2) The O1 reactor was operated at target flux and target purity for 1000 hours. This quarterly technical progress report will summarize work accomplished for Phase 2 Program during the quarter October to December 2002. In task 1 improvements to PSO1x have shown increased performance in strength and stability. In task 2, PSO1d and PSO1x elements have been fabricated for testing in the pilot reactor. In task 3, the lab-scale pilot reactor has been operated for 1000 hours. In task 6 initial power recovery simulation has begun. In task 7, HYSIS models have been developed to optimize the process for a future demonstration unit.

【 预 览 】
附件列表
Files Size Format View
823620.pdf 18KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:17次