科技报告详细信息
FIELD DEMONSTRATION OF A MEMBRANE PROCESS TO SEPERATE NITROGEN FROM NATURAL GAS
Lokhandwala, Kaaeid
Membrane Technology and Research, Inc. (United States)
关键词: Natural Gas;    Natural Gas Fields;    Membranes;    Testing;    Marketing;   
DOI  :  10.2172/822702
RP-ID  :  NONE
RP-ID  :  FC26-01NT41225
RP-ID  :  822702
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The original proposal described the construction and operation of a 1 MMscfd treatment system to be operated at a Butcher Energy gas field in Ohio. The gas produced at this field contained 17% nitrogen. During pre-commissioning of the project, a series of well tests showed that the amount of gas in the field was significantly smaller than expected and that the nitrogen content of the wells was very high (25 to 30%). After evaluating the revised cost of the project, Butcher Energy decided that the plant would not be economical and withdrew from the project. Since that time, Membrane Technology and Research, Inc. (MTR) has signed a marketing and sales partnership with ABB Lummus Global. MTR will be working with the company's Randall Gas Technology group, a supplier of equipment and processing technology to the natural gas industry. Randall's engineering group has found a new site for the project at a North Texas Exploration (NTE) gas processing plant. The plant produces about 1 MMscfd of gas containing 24% nitrogen. The membrane unit will bring this gas to 4% nitrogen for delivery to the pipeline. The membrane skid is being built by ABB. NTE has ordered the required compressor and MTR is making the membrane modules. System fabrication was completed in January 2004 and the membrane inserts were loaded. Additional pressure testing and verification will be completed prior to shipment, which is expected in early February 2004.

【 预 览 】
附件列表
Files Size Format View
822702.pdf 180KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:23次