科技报告详细信息
RTO Briefing
Wiese, Steve
RESOLVE, Inc. (United States)
关键词: Wind Turbines;    Capacity;    Implementation;    Wind Power;    California;   
DOI  :  10.2172/822437
RP-ID  :  3B
RP-ID  :  FG03-00SF22100
RP-ID  :  822437
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

OAK-B135 Transmission Updates The summary of this report is: (1) Small generators are not happy with FERC's Small Generator Interconnection NOPR, saying the proposed rule ignores much of the consensus developed between small generators and transmission owners during the ANOPR process. California wind generators seek clarification that repowering an existing facility or changing contract terms would not trigger a reevaluation of the interconnection. (2) The choices of former Alliance companies about which RTO to join, MISO or PJM, and whether they can obtain approval from states to do so, has created such a tangle that FERC held two days of hearings at the end of September on the issues and options for resolving them. But in addition to some constructive input, the hearings produced even more uncertainty, with transmission companies announcing their need to reassess their own RTO commitments depending on the decisions of others. (3) In the West, the Seams Steering Group--Western Interconnection (SSG-WI) completed a west-wide transmission study with a renewable energy scenario, the California ISO received FERC's approval on its market redesign proposal, and RTO West worked toward finalizing high-level consensus documents describing Day 1 implementation of the proposed RTO. (4) In Texas, ERCOT began $157 million in upgrades to the transmission system around McCamey--increasing capacity in and out of the area enough to handle existing wind projects there.

【 预 览 】
附件列表
Files Size Format View
822437.pdf 213KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:4次