科技报告详细信息
UTSI/CFFF MHD PROGRAM COMPLETION AND RELATED ACTIVITY
Muehlhauser, Joel
University of Tennessee
关键词: Testing;    Monitoring;    Ground Water;    Environmental Impacts;    Sampling;   
DOI  :  10.2172/822380
RP-ID  :  NONE
RP-ID  :  AC22-95PC95231
RP-ID  :  822380
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The Discharge Monitoring Reports (DMRs) for July, August and September, 2003, were prepared and submitted to the Tennessee Department of Environment and Conservation (TDEC). Discussions were held during July with our environmental consulting firm (TVG Environmental) and the Tennessee Department of Environment and Conservation (TDEC) about the groundwater testing program for the CFFF. Both TVG and TDEC advised that we continue with the semiannual sampling schedule for at least the next 6 months to a year. A relatively new category titled Site-Specific Impaired Classification is being considered for the CFFF, but the documentation requirements are expected to be extensive and expensive. The next sampling event will be contracted for in November 2003. In addition to regular monthly report to TDEC, a regional inspector from TDEC came by to inspect the CFFF for compliance with the water discharge permit. He took a short tour of the facility and subsequently issued a statement that the CFFF was in compliance with the permit. TVG Environmental, Inc. of Nashville was requested to provide a cost quote to perform the next scheduled groundwater sampling event for the CFFF. They quoted the same per-event cost as the two previous sampling events. TVG was awarded the contract and the next scheduled semiannual sampling event will occur in mid-November.

【 预 览 】
附件列表
Files Size Format View
822380.pdf 254KB PDF download
  文献评价指标  
  下载次数:34次 浏览次数:25次