IMPROVED MISCIBLE NITROGEN FLOOD PERFORMANCE UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL LATERALS IN A CLASS I RESERVOIR - EAST BINGER (MARCHAND) UNIT | |
Sinner, Joe | |
Binger Operations, LLC (United States) | |
关键词: Oil Wells; 02 Petroleum; Geologic Models; Directional Drilling; Petroleum; | |
DOI : 10.2172/820019 RP-ID : NONE RP-ID : FC26-00BC15121 RP-ID : 820019 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
Implementation of the work program of Budget Period 2 of the East Binger Unit (''EBU'') DOE Project continues. Significant advances with the reservoir simulation model have led to changes in the program. One planned horizontal well location, EBU 44-3H, has been eliminated from the program, and another, EBU 45-3H, has been deferred, and may be replaced by a vertical well or completely eliminated at a future date. A new horizontal well location, EBU 63-2H, has been added. EBU 74G-2, the one new injection well planned for the project, was completed and brought on production. It will be produced for a period of time before converting it to injection. Performance is exceeding expectations. Work also continued on projects aimed at increasing injection in the pilot area. EBU 65-1 was converted to injection service. The project to add compression and increase injection capacity at the nitrogen management facility is nearing completion. Additional producer-to-injector conversions will follow.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
820019.pdf | 307KB | download |