科技报告详细信息
IMPROVED MISCIBLE NITROGEN FLOOD PERFORMANCE UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL LATERALS IN A CLASS I RESERVOIR - EAST BINGER (MARCHAND) UNIT
Sinner, Joe
Binger Operations, LLC (United States)
关键词: Oil Wells;    02 Petroleum;    Geologic Models;    Directional Drilling;    Petroleum;   
DOI  :  10.2172/820019
RP-ID  :  NONE
RP-ID  :  FC26-00BC15121
RP-ID  :  820019
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Implementation of the work program of Budget Period 2 of the East Binger Unit (''EBU'') DOE Project continues. Significant advances with the reservoir simulation model have led to changes in the program. One planned horizontal well location, EBU 44-3H, has been eliminated from the program, and another, EBU 45-3H, has been deferred, and may be replaced by a vertical well or completely eliminated at a future date. A new horizontal well location, EBU 63-2H, has been added. EBU 74G-2, the one new injection well planned for the project, was completed and brought on production. It will be produced for a period of time before converting it to injection. Performance is exceeding expectations. Work also continued on projects aimed at increasing injection in the pilot area. EBU 65-1 was converted to injection service. The project to add compression and increase injection capacity at the nitrogen management facility is nearing completion. Additional producer-to-injector conversions will follow.

【 预 览 】
附件列表
Files Size Format View
820019.pdf 307KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:68次