This document assesses the need for additional tank isolation systems and tooling at the Oak Ridge National Laboratory (ORNL). Locations for future operations at ORNL include the South and North Tank Farms and various Federal Facilities Agreement tanks. The goal of this report is to identify future needs for development of remote tools and systems to isolate inactive waste storage tanks. Remote tools have been developed to support waste-retrieval and tank-isolation operations at the Gunite and Associated Tanks (GAATs) at ORNL. The tools developed for in-tank remote operations include a pipe-cutting tool (a modified band saw), a pipe-cleaning tool (a modified drill with a wire brush), and a pipe plug. A review of the planned future operations revealed several desirable modifications to improve the efficiency, operability, and flexibility of the existing tank-isolation tools. For example, the pipe-cutting tool needs improvements to provide better alignment, a blade-cutting-release device, improved tire replacement, sensors to prevent operation of the saw when the blade stops, blade speed controls, and force feedback sensors. In addition, the need to test the existing pipe plug for use on corroded piping was identified. The pipe plug has been used on only relatively clean in-tank stainless steel (SS) piping to date. However, there may be a need later to use the plug on corroded SS and other types of pipes. Improvements to the pipe plug for use on flush wall pipes and small-diameter openings in tanks are also desirable. Besides tank isolation, those performing tank closures may need to use cutting and capping equipment on buried pipes. The current cutting and capping equipment may have to be modified for deployment systems other than the Modified Light Duty Utility Arm, for which they were initially designed. Improved cutting and other remote systems may also be needed to dispose of contaminated equipment and tank shells. These requirements will be defined jointly by the U.S. Department of Energy, the U.S. Environmental Protection Agency, and the state of Tennessee as part of the overall remedial decision for the ORNL Bethel Valley area.

【 预 览 】
附件列表
Files Size Format View
814544.pdf 52KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:15次