DEVELOPMENT OF TECHNOLOGIES AND ANALYTICAL CAPABILITIES FOR VISION 21 ENERGY PLANTS | |
Madhava Syamlal, Ph.D. | |
Fluent, Inc. (United States) | |
关键词: Program Management; 99 General And Miscellaneous//Mathematics, Computing, And Information Science; F Codes; Planning; 20 Fossil-Fueled Power Plants; | |
DOI : 10.2172/809160 RP-ID : NONE RP-ID : FC26-00NT40954 RP-ID : 809160 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
To complete project planning, various project groups conducted several meetings and teleconferences. As a result a draft project management plan was written and circulated. The plan will be finalized in a project kick off meeting to be held on January 16, 2001 in Lebanon, NH, which will be attended by all project participants (Task 1.0). Various project personnel have been trained in the use of Fluent and Aspen Plus, which completes all the training tasks except for Aspen Plus and IDL training for Alstom Power (Task 2.1). A preliminary version of User Requirements Document (preURD) was written. This document will be sent to key users of Aspen Plus and FLUENT and their responses will be collected in January (Task 2.3). A prototype of Fluent integration with Aspen Plus was constructed for understanding the required software design. The development of a general architecture for the integrated software suite has been started (Task 2.6). Invitation letters for participation in an Advisory Board were sent out to several Vision 21 contractors. Their responses will be used to form an Advisory Board in January (Task 5.0). Fluent has awarded subcontracts to Alstom Power, CERC, and Aspen Tech and negotiations with Intergraph are underway. Aspen Plus and FLUENT were installed on a computer at CERC. The design of a project web site was completed, and the site setup was started (Task 7.0).
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
809160.pdf | 30KB | download |