科技报告详细信息
ONSI-FUEL CELL PROJECT ''AEB BIRSFELDEN/BASEL | |
Reese, Dipl.-Ing. Irina ; Bode, Dipl.-Ing. Andreas | |
AEB Alternativ-Energie Birsfelden AG (United States) | |
关键词: Heat Pumps; Boilers; Turbines; 32 Energy Conservation, Consumption, And Utilization; Switzerland; | |
DOI : 10.2172/808129 RP-ID : NONE RP-ID : FG26-99FT40671 RP-ID : 808129 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
AEB Alternativ-Energie Birsfelden AG is supplying several buildings, a public indoor pool and one school with electrical and thermal energy from 5 Kaplan turbines, 2 heat-pumps and conventional boilers. The hating station is called ''Heizzentrale Kirchmatt''. The total heat demand is 3.8 MW peak and 5.5 GWh/a. The Department of Energy of Switzerland supports this project. The FC combined heat and power plant is part of this project with priority in supply of domestic heat. The ONSI PC25C was installed by AEB on a school yard in Birsfelden a district of the Swiss city Basel.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
808129.pdf | 179KB | download |