| System Configuration Management Implementation Procedure for the Canister Storage Building (CSB) | |
| GARRISON, R.C. | |
| Fluor Hanford, Inc. | |
| 关键词: Management; Storage; Implementation; 32 Energy Conservation, Consumption, And Utilization; Gaseous Wastes; | |
| DOI : 10.2172/805457 RP-ID : SNF-7095, Rev.1 RP-ID : AC06-96RL13200 RP-ID : 805457 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
This document provides configuration management for the Distributed Control System (DCS), the Gaseous Effluent Monitoring System (GEMS-100) System, the Heating Ventilation and Air Conditioning (HVAC) Programmable Logic Controller (PLC), the Canister Receiving Crane (CRC) CRN-001 PLC, and both North and South vestibule door interlock system PLCs at the Canister Storage Building (CSB). This procedure identifies and defines software configuration items in the CSB control and monitoring systems, and defines configuration control throughout the system life cycle. Components of this control include: configuration status accounting; physical protection and control; and verification of the completeness and correctness of these items.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 805457.pdf | 903KB |
PDF