科技报告详细信息
System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)
GARRISON, R.C.
Fluor Hanford, Inc.
关键词: Management;    Storage;    Implementation;    32 Energy Conservation, Consumption, And Utilization;    Gaseous Wastes;   
DOI  :  10.2172/805457
RP-ID  :  SNF-7095, Rev.1
RP-ID  :  AC06-96RL13200
RP-ID  :  805457
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This document provides configuration management for the Distributed Control System (DCS), the Gaseous Effluent Monitoring System (GEMS-100) System, the Heating Ventilation and Air Conditioning (HVAC) Programmable Logic Controller (PLC), the Canister Receiving Crane (CRC) CRN-001 PLC, and both North and South vestibule door interlock system PLCs at the Canister Storage Building (CSB). This procedure identifies and defines software configuration items in the CSB control and monitoring systems, and defines configuration control throughout the system life cycle. Components of this control include: configuration status accounting; physical protection and control; and verification of the completeness and correctness of these items.

【 预 览 】
附件列表
Files Size Format View
805457.pdf 903KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:10次