科技报告详细信息
Interim Stabilization Equipment Essential and Support Drawing Plan | |
HORNER, T.M. | |
CH2M Hill Hanford Group, Inc. | |
关键词: Safety Engineering; Stabilization; Nuclear Facilities; Engineering Drawings; 11 Nuclear Fuel Cycle And Fuel Materials; | |
DOI : 10.2172/805402 RP-ID : HNF-4184, Rev.9 RP-ID : AC06-96RL13200 RP-ID : 805402 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a].
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
805402.pdf | 419KB | download |