科技报告详细信息
Fluor Hanford Nuclear Material Stabilization Project Welding Manual
BERKEY, J.R.
Fluor Daniel Hanford, Inc.
关键词: Testing;    Manuals;    Stabilization;    Recommendations;    Specifications;   
DOI  :  10.2172/805365
RP-ID  :  HNF-7082, Rev.0
RP-ID  :  AC06-96RL13200
RP-ID  :  805365
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The purpose of this section of the welding manual is to: (1) Provide a general description of the major responsibilities of the organizations involved with welding. (2) Provide general guidance concerning the application of codes related to welding. This manual contains requirements for welding for all Fluor Hanford (FH) welding operators working on the W460 Project, in the Plutonium Finishing Plant (PFP) at the U. S. Department of Energy (DOE) Hanford facilities. These procedures and any additional requirements for these joining processes can be used by all FH welding operators that are qualified. The Welding Procedure Specifications (WPS) found in this document were established from Procedure Qualification Records (PQR) qualified by FH specifically for the W460 Project. PQRs are permanent records of the initial testing and qualification program and are used to backup, and support, the WPS. The identification numbers of the supporting PQR(s) are recorded on each WPS. All PQRs are permanently stored under the supervision of the Fluor Hanford Welding Engineer (FHWE). New PQRs and WPSs will continue to be developed as necessary. The qualification of welders, welding operators and welding procedures will be performed for FH under supervision and concurrent of the FHWE. All new welding procedures to be entered in this manual or welder personnel to be added to the welder qualification database, shall be approved by the FHWE.

【 预 览 】
附件列表
Files Size Format View
805365.pdf 853KB PDF download
  文献评价指标  
  下载次数:18次 浏览次数:7次