科技报告详细信息
| Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants | |
| DE& ; S, Camillo A. DiNunzio Framatome ANP ; NCSU, Dr. Abhinav Gupta Assistant Professor ; Laboratories, Dr. Michael Golay Professor MIT Dr. Vincent Luk Sandia National ; Systems, Rich Turk Westinghouse Electric Company Nuclear ; Charles Morrow, Sandia National Laboratories ; Geum-Taek Jin, Korea Power Engineering Company Inc. | |
| Framatome-ANP DE and S (United States) | |
| 关键词: Cost; Management; Schedule; Schedules Construction; Capitalized Cost; | |
| RP-ID : DE-FC0-99SF21898/A002 RP-ID : FC03-99SF21898 RP-ID : 805265 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
OAK-B135 This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 805265.pdf | 4328KB |
PDF