科技报告详细信息
Interim Safety Basis for Fuel Supply Shutdown Facility | |
BENECKE, M.W. | |
Fluor Hanford, Inc. | |
关键词: Uranium; Recommendations; Safety Analysis; 11 Nuclear Fuel Cycle And Fuel Materials; Nuclear Facilities; | |
DOI : 10.2172/804807 RP-ID : HNF-SD-NR-ISB-001, Rev.1 RP-ID : AC06-96RL13200 RP-ID : 804807 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
804807.pdf | 2775KB | download |