Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)
PICKETT, W.W.
Fluor Hanford, Inc.
关键词: Welding;    Storage;    Dry Storage;    Start-Up;    Yucca Mountain;   
DOI  :  10.2172/804800
RP-ID  :  SNF-6442, Rev.0
RP-ID  :  AC06-96RL13200
RP-ID  :  804800
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】
The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure.
【 预 览 】
附件列表
Files Size Format View
804800.pdf 4748KB PDF download
  文献评价指标  
  下载次数:23次 浏览次数:18次