科技报告详细信息
| Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V | |
| Koch, M. R. | |
| CH2M Hill Hanford Group, Inc. | |
| 关键词: Pumping; Monitoring; Storage Facilities; Radioactive Wastes; Performance Testing; | |
| DOI : 10.2172/804240 RP-ID : RPP-6201, Rev.1 RP-ID : AC27-99RL14047 RP-ID : 804240 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 804240.pdf | 1573KB |
PDF