科技报告详细信息
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V
Koch, M. R.
CH2M Hill Hanford Group, Inc.
关键词: Pumping;    Monitoring;    Storage Facilities;    Radioactive Wastes;    Performance Testing;   
DOI  :  10.2172/804240
RP-ID  :  RPP-6201, Rev.1
RP-ID  :  AC27-99RL14047
RP-ID  :  804240
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.

【 预 览 】
附件列表
Files Size Format View
804240.pdf 1573KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:11次