Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor
Mercado, L. C.
CH2M Hill Hanford Group, Inc.
关键词: Storage;    12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities;    Rivers;    Wastes;    Contractors;   
DOI  :  10.2172/803015
RP-ID  :  RPP-6113, Rev.0
RP-ID  :  AC27-99RL14047
RP-ID  :  803015
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects.

【 预 览 】
附件列表
Files Size Format View
803015.pdf 1171KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:13次