Notice of Construction for Tank Waste Remediation System Vadose Zone Characterization | |
HILL, J.S. | |
DOE-RL (United States) | |
关键词: Radiation Protection; Us Epa; Boreholes; Tanks; Wastes; | |
DOI : 10.2172/802969 RP-ID : DOE/ORP-2000-05, Rev.1 RP-ID : AC27-99RL14047 RP-ID : 802969 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The following description and any attachments and references are provided to the Washington State Department of Health (WDOH), Division of Radiation Protection, Air Emissions and Defense Waste Section as a notice of construction (NOC) in accordance with Washington Administrative Code (WAC) 246-247, Radiation Protection-Air Emissions. The WAC 246-247-060, ''Applications, registration, and licensing'', states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of information listed in Appendix A.'' Appendix A (WAC 246-247-1 10) lists the requirements that must be addressed. The original NOC was submitted in May of 1999 as DOm-99-34. Additionally, the following description, attachments and references are provided to the U.S. Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40 Code of Federal Regulations (CFR), Part 61, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide less than 0.1 milliredyear total effective dose equivalent (TEDE) to the hypothetical offsite maximally exposed individual (MEI), and commencement is needed within a short time frame. Therefore, this application is also intended to provide notification of the anticipated date of initial start-up in accordance with the requirement listed in 40 CFR 61.09(a)(1), and it is requested that approval of this application will also constitute EPA acceptance of this initial start-up notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2) will be provided at a later date. This NOC covers the activities associated with vadose zone characterization within the Single-Shell Tank Farms located in the 200-East and 200-West Areas of the Hanford Site. Vadose zone characterization activities include the drilling and sampling of soil from the surface to the depth of groundwater. Boreholes that are drilled to groundwater will be extended into the aquifer a sufficient distance to enable a groundwater sample to be collected. Under extenuating circumstances it may be prudent to complete these characterization boreholes as groundwater monitoring wells.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
802969.pdf | 4144KB | download |