科技报告详细信息
Preparation of Phased and Merged Safety Analysis Reports for New DOE Nuclear Facilities
BISHOP, G.E.
DOE-RL (United States)
关键词: Acceleration;    Storage;    Fuel Elements;    Drying;    Nuclear Facilities;   
DOI  :  10.2172/802968
RP-ID  :  DOE-0283-FP, Rev.0
RP-ID  :  AC06-96RL13200
RP-ID  :  802968
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The Spent Nuclear Fuels Project (SNFP) is charged with moving to storage 2,100 metric tons of spent nuclear fuel elements left over from plutonium production at DOE'S Hanford site in Washington state. Two new facilities, the Cold Vacuum Drying Facility (CVDF) and the Canister Storage Building (CSB) are in final construction. In order to meet aggressive schedule commitments, the SNFP chose to prepare the safety analysis reports (SAR's) in phases that covered only specific portions of each facility's design as it was built. Each SAR also merged the preliminary and final safety analysis reports into a single SAR, thereby covering all aspects of design, construction, and operation for that portion (phase) of the facility. A policy of ''NRC equivalency'' was also implemented in parallel with this effort, with the goal of achieving a rigor of safety analysis equivalent to that of NRC-licensed fuel processing facilities. DOE Order 5480.23. ''Nuclear Safety Analysis Reports'' allows preparation of both a phased and a merged SAR to accelerate construction schedules. However, project managers must be aware that such acceleration is not guaranteed. Managers considering this approach for their project should be cognizant of numerous obstacles that will be encountered. Merging and phasing SAR's will create new, unique, and unanticipated difficulties which may actually slow construction unless expeditiously and correctly managed. Pitfalls to be avoided and good practices to be implemented in preparing phased and merged SAR's are presented. The value of applying NRC requirements to the DOE safety analysis process is also discussed. As of December, 1999, the SNFP has completed and approved a SAR for the CVDF. Approval of the SAR for the CSB is pending.

【 预 览 】
附件列表
Files Size Format View
802968.pdf 1033KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:12次