科技报告详细信息
| Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P | |
| Koch, M. R. | |
| CH2M Hill Hanford Group, Inc. | |
| 关键词: Pumping; Radioactive Waste Storage; Storage Facilities; Performance Testing; Measuring Instruments; | |
| DOI : 10.2172/801870 RP-ID : RPP-5773, Rev.0 RP-ID : AC27-99RL14047 RP-ID : 801870 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 801870.pdf | 1789KB |
PDF