科技报告详细信息
Evaluation of 3 Inch SN-219 Failure and S and SX Tank Farm Saltwell Piping | |
ELSEN, J.J. | |
CH2M Hill Hanford Group, Inc. | |
关键词: Pumping; Pipelines; Radioactive Wastes; Storage Facilities; Failure Mode Analysis; | |
DOI : 10.2172/801352 RP-ID : RPP-5825, Rev.0 RP-ID : AC27-99RL14047 RP-ID : 801352 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
Evaluation of direct buried piping currently in use or designated for future Saltwell pumping in S and SX Farms. Documented evaluation of failed S-103 saltwell pumping transfer line 3 inch SN-219. This evaluation is intended to reflect current status of Saltwell piping, when taken in context with referenced documents.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
801352.pdf | 477KB | download |