科技报告详细信息
Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)
PITNER, A.L.
Fluor Hanford, Inc.
关键词: Testing;    Water Treatment;    Specifications;    Functionals;    Start-Up;   
DOI  :  10.2172/801315
RP-ID  :  HNF-4898, Rev.0
RP-ID  :  AC06-96RL13200
RP-ID  :  801315
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. These tests are described in separate planning documents. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: (1) Define the test scope for the FRS and IWTS; (2) Provide detailed test requirements that can be used to write the specific test procedures; (3) Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and (4) Define specific test objectives and acceptance criteria.

【 预 览 】
附件列表
Files Size Format View
801315.pdf 2038KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:15次