Process Test Plan Shutdown P16 Exhauster
PARKMAN, D.B.
CH2M Hill Hanford Group, Inc.
关键词: Radioactive Waste Storage;    Storage Facilities;    Exhaust Systems;    12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities;    Shutdown;   
DOI  :  10.2172/801150
RP-ID  :  RPP-5646, Rev.0
RP-ID  :  AC27-99RL14047
RP-ID  :  801150
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This Process Test Plan was written to gather temperature data to determine the amount of heat load remaining in tank 241-C-106. This process test plan is being conducted to gather the temperature data necessary to determine how much of the initial heat load is still left in 241-C-106. The heat load will be determined by shutting off the C-106 exhaust system, monitoring the change in tank temperature, and plugging the resulting data into the thermal model for this tank.