Plan for the Initiation of HA-211 Furnace Operations at the Plutonium Finishing Plan (PFP)
WILLIS, H.T.
Fluor Hanford, Inc.
关键词: Stabilization;    Start-Up;    Furnaces;    11 Nuclear Fuel Cycle And Fuel Materials;    Planning;   
DOI  :  10.2172/801125
RP-ID  :  HNF-5638, Rev.0
RP-ID  :  AC06-96RL13200
RP-ID  :  801125
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This plan provides a phased approach authorizing the use of three additional muffle furnaces for thermal stabilization. Achievement of Thermal Stabilization mission elements require the installation and startup of three additional muffle furnaces for the thermal stabilization of plutonium and plutonium bearing materials at the Plutonium Finishing Plant (PFP). The release to operate these additional furnaces will require an Activity Based Startup Review. The conduct of the Activity Based Startup Review (ABSR) was approved by Fluor Daniel Hanford on October 15, 1999. This plan has been developed with the objective of identifying those activities needed to guide the controlled startup of five furnaces from authorization to unrestricted operations by adding the HA-211 furnaces in an orderly and safe manner after the approval to Startup has been given.

【 预 览 】
附件列表
Files Size Format View
801125.pdf 507KB PDF download
  文献评价指标  
  下载次数:19次 浏览次数:16次