科技报告详细信息
Summary of Results from Minimelter Run with Macrobatch 3 Baseline Feed Using Frit 320
Miller, D.H.
Savannah River Site (S.C.)
关键词: Sludges;    Waste Forms;    Radioactive Waste Processing;    Performance Testing;    Glass;   
DOI  :  10.2172/800728
RP-ID  :  WSRC-TR-2002-00188
RP-ID  :  AC09-96SR18500
RP-ID  :  800728
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This report covers the testing completed as the melter was transitioned from a simulated blend of Tank 8/40 (sludge Batch 2) with frit 200 to a simulated blend of Tank 8/40 with frit 320. The same sludge was used to produce both batches of fed in the Glass Feed Preparation System (GFPS). This sludge is referred to as both Sludge Batch 2 and Macrobatch 3 in different reports.

【 预 览 】
附件列表
Files Size Format View
800728.pdf 149KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:15次