科技报告详细信息
Behavior of Capstone and Honeywell microturbine generators during load changes
Yinger, Robert J.
Lawrence Berkeley National Laboratory
关键词: Power Range 10-100 Kw;    Start-Up;    Load Analysis;    Performance Testing;    42 Engineering;   
DOI  :  10.2172/795339
RP-ID  :  LBNL--49095
RP-ID  :  AC03-76SF00098
RP-ID  :  795339
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This report describes test measurements of the behavior of two microturbine generators (MTGs) under transient conditions. The tests were conducted under three different operating conditions: grid-connect; stand-alone single MTG with load banks; and two MTGs running in parallel with load banks. Tests were conducted with both the Capstone 30-kW and Honeywell Parallon 75-kW MTGs. All tests were conducted at the Southern California Edison /University of California, Irvine (UCI) test facility. In the grid-connected mode, several test runs were conducted with different set-point changes both up and down and a start up and shutdown were recorded for each MTG. For the stand-alone mode, load changes were initiated by changing load-bank values (both watts and VARs). For the parallel mode, tests involved changes in the load-bank settings as well as changes in the power set point of the MTG running in grid-connect mode. Detailed graphs of the test results are presented. It should be noted that these tests were done using a specific hardware and software configuration. Use of different software and hardware could result in different performance characteristics for the same units.

【 预 览 】
附件列表
Files Size Format View
795339.pdf 2078KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:62次