Behavior of Capstone and Honeywell microturbine generators during load changes | |
Yinger, Robert J. | |
Lawrence Berkeley National Laboratory | |
关键词: Power Range 10-100 Kw; Start-Up; Load Analysis; Performance Testing; 42 Engineering; | |
DOI : 10.2172/795339 RP-ID : LBNL--49095 RP-ID : AC03-76SF00098 RP-ID : 795339 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This report describes test measurements of the behavior of two microturbine generators (MTGs) under transient conditions. The tests were conducted under three different operating conditions: grid-connect; stand-alone single MTG with load banks; and two MTGs running in parallel with load banks. Tests were conducted with both the Capstone 30-kW and Honeywell Parallon 75-kW MTGs. All tests were conducted at the Southern California Edison /University of California, Irvine (UCI) test facility. In the grid-connected mode, several test runs were conducted with different set-point changes both up and down and a start up and shutdown were recorded for each MTG. For the stand-alone mode, load changes were initiated by changing load-bank values (both watts and VARs). For the parallel mode, tests involved changes in the load-bank settings as well as changes in the power set point of the MTG running in grid-connect mode. Detailed graphs of the test results are presented. It should be noted that these tests were done using a specific hardware and software configuration. Use of different software and hardware could result in different performance characteristics for the same units.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
795339.pdf | 2078KB | download |