科技报告详细信息
Implementation Plan: Jasper Management Prestart Review (Surrogate Material Experiments)
Cooper, W.E.
Lawrence Livermore National Laboratory
关键词: Management;    Radiation Protection;    Waste Management;    99 General And Miscellaneous//Mathematics, Computing, And Information Science;    Actinides;   
DOI  :  10.2172/792744
RP-ID  :  UCRL-ID-140615
RP-ID  :  W-7405-Eng-48
RP-ID  :  792744
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Able Site is located 24 km northwest of Mercury on the Nevada Test Site. The Nevada Test Site is approximately 105 km northwest of Las Vegas, NV. Major facilities at Able Site include Buildings 5100,5180, and 5191. Significant external interfaces for the JASPER site include the electrical system, wastewater system, communications systems, and water supply system, which provides both potable and fire-protection water. Support services, which are provided on the Nevada Test Site, include medical, emergency response (NTS Fire Department), radiation protection, industrial hygiene, and waste management. Although JASPER will ultimately be used for actinide research, the start-up process requires system demonstration using surrogates in place of the actinide targets. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. A second MPR will be conducted before actinide experiments are executed. This document addresses implementation requirements for only the first MPR. This first review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before this formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating special nuclear material (SNM) into future experiments, the team will convene again as part of the process of authorizing those activities. A summary of the review schedule is provided.

【 预 览 】
附件列表
Files Size Format View
792744.pdf 562KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:79次