Wabash River Coal Gasification Repowering Project: A DOE Assessment
National Energy Technology Laboratory (U.S.)
National Energy Technology Laboratory (U.S.)
关键词: Coal Gasification;    Boilers;    Joint Ventures;    01 Coal, Lignite, And Peat;    Gasification;   
DOI  :  10.2172/790376
RP-ID  :  DOE/NETL-2002/1164
RP-ID  :  NONE
RP-ID  :  790376
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of $438 million.

【 预 览 】
附件列表
Files Size Format View
790376.pdf 293KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:25次