科技报告详细信息
Plutonium Immobilization Project System Design Description for Can Loading System | |
Kriikku, E. | |
Savannah River Site (S.C.) | |
关键词: Loading; Remote Handling Equipment; Maintenance; Savannah River Plant; Design; | |
DOI : 10.2172/774851 RP-ID : WSRC-TR-2001-00006 RP-ID : AC09-96SR18500 RP-ID : 774851 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The purpose of this System Design Description (SDD) is to specify the system and component functions and requirements for the Can Loading System and provide a complete description of the system (design features, boundaries, and interfaces), principles of operation (including upsets and recovery), and the system maintenance approach. The Plutonium Immobilization Project (PIP) will immobilize up to 13 metric tons (MT) of U.S. surplus weapons usable plutonium materials.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
774851.pdf | 576KB | download |