科技报告详细信息
Plutonium Immobilization Project System Design Description for Can Loading System
Kriikku, E.
Savannah River Site (S.C.)
关键词: Loading;    Remote Handling Equipment;    Maintenance;    Savannah River Plant;    Design;   
DOI  :  10.2172/774851
RP-ID  :  WSRC-TR-2001-00006
RP-ID  :  AC09-96SR18500
RP-ID  :  774851
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The purpose of this System Design Description (SDD) is to specify the system and component functions and requirements for the Can Loading System and provide a complete description of the system (design features, boundaries, and interfaces), principles of operation (including upsets and recovery), and the system maintenance approach. The Plutonium Immobilization Project (PIP) will immobilize up to 13 metric tons (MT) of U.S. surplus weapons usable plutonium materials.

【 预 览 】
附件列表
Files Size Format View
774851.pdf 576KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:18次