| Innovative hybrid gas/electric chiller cogeneration. Quarterly technical progress report, April--June, 2000 | |
| Nowakowski, G. | |
| Federal Energy Technology Center (U.S.) | |
| 关键词: Electric Motors; Refrigerants; Cogeneration; Progress Report; Compressors; | |
| DOI : 10.2172/774503 RP-ID : DE--FC26-99FT40641-02 RP-ID : FC26-99FT40641 RP-ID : 774503 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
A meeting was held at Alturdyne's facility in San Diego to discuss project progress. Cliff Carpenter, the NETL Program Manager, attended the meeting. As a result of the meeting, several decisions were made: (1) A General Motors engine would be specified as the prime mover; (2) A Carrier reciprocating compressor would be specified, however a Hitachi screw compressor with an integral oil sump was an interesting candidate if it was available in the right size and for the right price; (3) The motor/generator would provide two functions: as an induction motor and as a synchronous generator. The variable speed, constant frequency feature will not be included in the first generation product; and (4) The refrigerant will be R134-A.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 774503.pdf | 129KB |
PDF