科技报告详细信息
Conceptual design assessment for the co-firing of bio-refinery supplied lignin project. Quarterly report, July 1--September 30, 2000
Berglund, T. ; Ranney, J.T. ; Babb, C.L.
Federal Energy Technology Center (U.S.)
关键词: Lignin;    Modifications;    Water Removal;    Pipelines;    Ethanol Plants;   
DOI  :  10.2172/774488
RP-ID  :  DE--FC26-99FT40670-02
RP-ID  :  FC26-99FT40670
RP-ID  :  774488
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The initial design criteria of the MSW to ethanol facility have been completed along with preliminary site identification and layouts for the processing facility. These items are the first step in evaluating the feasibility of this co-located facility. Pilot facility design and modification are underway for the production and dewatering of the lignin fuel. Major process equipment identification has been completed and several key unit operations will be accomplished on rental equipment. Equipment not available for rental or at TVA has been ordered and facility modification and shakedown will begin in October. The study of the interface and resulting impacts on the TVA Colbert facility are underway. The TVA Colbert fossil plant is fully capable of providing a reliable steam supply for the proposed Masada waste processing facility. The preferred supply location in the Colbert steam cycle has been identified as have possible steam pipeline routes to the Colbert boundary. Additional analysis is underway to fully predict the impact of the steam supply on Colbert plant performance and to select a final steam pipeline route.

【 预 览 】
附件列表
Files Size Format View
774488.pdf 38KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:17次