科技报告详细信息
UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING PHASE 3 RESTRUCTURED (3R)
Federal Energy Technology Center (U.S.)
关键词: Testing;    Turbines;    24 Power Transmission And Distribution;    Design;    Power Systems;   
DOI  :  10.2172/766360
RP-ID  :  DE--FC21-95MC31176--26
RP-ID  :  FC21-95MC31176
RP-ID  :  766360
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This scope document defines the work scope for accomplishing the design of the GE MS7001H and MS9001H (7H and 9H) combined-cycle power systems under the original ATS Phase 3 DOE Cooperative Agreement No. DE-FC21-95MC31176, and incorporates changes in scope required to convert Phase 3 to the ''restructured'' Phase 3R as defined in Amendment A012 to the Cooperative Agreement.

【 预 览 】
附件列表
Files Size Format View
766360.pdf 2949KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:1次