科技报告详细信息
| UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING PHASE 3 RESTRUCTURED (3R) | |
| Federal Energy Technology Center (U.S.) | |
| 关键词: Testing; Turbines; 24 Power Transmission And Distribution; Design; Power Systems; | |
| DOI : 10.2172/766360 RP-ID : DE--FC21-95MC31176--26 RP-ID : FC21-95MC31176 RP-ID : 766360 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
This scope document defines the work scope for accomplishing the design of the GE MS7001H and MS9001H (7H and 9H) combined-cycle power systems under the original ATS Phase 3 DOE Cooperative Agreement No. DE-FC21-95MC31176, and incorporates changes in scope required to convert Phase 3 to the ''restructured'' Phase 3R as defined in Amendment A012 to the Cooperative Agreement.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 766360.pdf | 2949KB |
PDF